<form id="vtntp"></form>

    <address id="vtntp"><nobr id="vtntp"><meter id="vtntp"></meter></nobr></address>

    <form id="vtntp"><listing id="vtntp"></listing></form>

      <sub id="vtntp"></sub>

      <form id="vtntp"></form>

      Welcome to the official website of Qufu Juli Railway Track Engineering Co., Ltd.!
      JuliWeChat

      7*24Hourly service call:

      189-5407-8805
      0537-4437678

      HOME

      ABOUT US

      PRODUCT

      ENGINEERING

      ACHIEVEMENT

      NEWS

      WORKSHOP

      CONTACT

      THE CHINESE DREAM · JULI SENTIMENT

      Only with ingenuity can we live up to our hearts

      For 15 consecutive years, our company has been highly praised by China Railway No.1, No.3, No.9, No.11, No.14, No.17, No.19, No.20, No.24, No.1, No.3, No.9, No.11, No.14, No.17, No.19, No.20, No.24 Railway Bureau, No.1 Bridge Bureau, No.2 tunnel Bureau, no.zhong Shui water engineering Co., Ltd. We have participated in cooperation in key national projects such as Qinghai Tibet railway, Beijing Shenyang Railway, Harbin Dalian railway, Beijing Shanghai Central South Corridor and Jiaoji railway……

      THE CHINESE DREAM · JULI SENTIMENT

      Only with ingenuity can we live up to our hearts

      For 15 consecutive years, our company has been highly praised by China Railway No.1, No.3, No.9, No.11, No.14, No.17, No.19, No.20, No.24, No.1, No.3, No.9, No.11, No.14, No.17, No.19, No.20, No.24 Railway Bureau, No.1 Bridge Bureau, No.2 tunnel Bureau, no.zhong Shui water engineering Co., Ltd. We have participated in cooperation in key national projects such as Qinghai Tibet railway, Beijing Shenyang Railway, Harbin Dalian railway, Beijing Shanghai Central South Corridor and Jiaoji railway……

      ENGINEERING CASE

      Make a project and create a classic

    1. Foreign project Performance

      Foreign project Performance

    2. Foreign project Performance

      Foreign project Performance

    3. Foreign project Performance

      Foreign project Performance

    4. Foreign project Performance

      Foreign project Performance

    5. Foreign project Performance

      Foreign project Performance

    6. Foreign project Performance

      Foreign project Performance

    7. Foreign project Performance

      Foreign project Performance

    8. Foreign project Performance

      Foreign project Performance

    9. PRODUCT CENTER

      Create "Juli" brand with high quality and ingenuity

    10. The workshop debugs sleeper production line equipment

      The workshop debugs sleeper production line equipment

      ○  Mould, sleeper production line, sleeper production line TEL:189-5407-8805

      MORE
    11. Roll over machine

      Roll over machine

      ○  Mould, sleeper production line, sleeper production line TEL:189-5407-8805

      MORE
    12. Sleeper production line

      Sleeper production line

      ○  Mould, sleeper production line, sleeper production line TEL:189-5407-8805

      MORE
    13. Vibration shaker

      Vibration shaker

      ○  Mould, sleeper production line, sleeper production line TEL:189-5407-8805

      MORE
    14. IIIC general mold

      IIIC general mold

      ○  Mould, sleeper production line, sleeper production line TEL:189-5407-8805

      MORE
    15. Bifurcation pillow mould

      Bifurcation pillow mould

      ○  Mould, sleeper production line, sleeper production line TEL:189-5407-8805

      MORE
    16. Subway support block mold

      Subway support block mold

      ○  Mould, sleeper production line, sleeper production line TEL:189-5407-8805

      MORE
    17. Double SK-1 mold

      Double SK-1 mold

      ○  Mould, sleeper production line, sleeper production line TEL:189-5407-8805

      MORE
    18. The UAE sleeper production line was loaded on board

      The UAE sleeper production line was loaded on board

      ○  Mould, sleeper production line, sleeper production line TEL:189-5407-8805

      MORE
    19. Foundation of embedded parts for mold turning machine

      Foundation of embedded parts for mold turning machine

      ○  Mould, sleeper production line, sleeper production line TEL:189-5407-8805

      MORE
    20. SIX ADVANTAGES

      Facing customers with integrity, quality makes the future

      JULI-Good track stability and cost saving

      Good track stability and cost saving

      All products produced by the company are up to standard,It is sold to Beijing, Tianjin, Shijiazhuang, Ethiopia, Nigeria, UAE and other countries;

      It has been well received by domestic and foreign customers;

      Become a well-known mold and non-standard equipment manufacturing enterprise in the domestic railway industry。

      JULI-Manufacturer, quality assurance

      Manufacturer, quality assurance

      200acresPlant area,30000More than square metersbuilt-up area;

      It has 350 sets of mechanical power equipment. The total value of fixed assets is more than 80 million yuan, with 212 employees and 29 professional and technical personnel。

      JULI-Large scale production, strong R & D strength

      Large scale production, strong R & D strength

      29R & D team,Annual output value1%R & D investment;

      It has a complete sleeper production line,The sleeper production line with flow unit method produced by our company has been used in many domestic sleeper production enterprises for many years. It is a set of mature sleeper production line equipment with the highest efficiency and the lowest failure rate;

      JULI-Each sleeper is traceable

      Each sleeper is traceable

      Select high quality raw materials, steam demoulding once molding;

      Each sleeper has to go through the mechanical property test, and the sleeper product has been obtainedProduction license of General Administration of quality of China;

      JULI-Periodic service and regular return visit

      Periodic service and regular return visit

      The technical team can effectively solve all kinds of problems in the track use process and provide all-round technical support;

      7*24hService experience,It mainly includes periodic track renewal or overhaul, periodic track comprehensive maintenance, regular inspection and key repair. The maintenance and repair of railway line can be divided into three aspects: regular maintenance, medium repair and overhaul。

      JULI-certificate of quality system

      Certificate of quality system

      It was adopted in 2003“Qufu Juli Railway Track Engineering Co., Ltd.”ISO9001 International quality system certification

      2013In cooperation with Beijing Jiaotong University, we jointly developed the first RPC concrete spherical hinge in China, and obtained 17 national patents;

      Passed in September 2015“”ISO9001 International quality system certification。

    21. JULI-Good track stability and cost saving
        01

        SECURITY
        · Good track stability and cost saving

        The company's products are all up to standard and sold to Beijing, Tianjin, Shijiazhuang and other countries, Ethiopia, Nigeria, UAE and other countries. It has been praised by domestic and foreign customers, and the current production of products is in short supply. It has become a well-known mold and non-standard equipment manufacturing enterprise in the domestic railway industry。

    22. JULI-Manufacturer, quality assurance
        02

        STRENGTH
        · Manufacturer, quality assurance

        More than 200 mu plant area, more than 30000 square meters of building area; with a variety of mechanical power equipment 350. The total value of fixed assets is more than 80 million yuan. There are 212 employees and 29 professional and technical personnel, including 4 senior technical titles, 12 intermediate technical titles and 13 junior technical titles. There are 48 intermediate professional and technical workers. At present, there are five departments and one office management system under the senior management of the chairman, general manager, deputy general manager and chief engineer。

    23. JULI-Large scale production, strong R & D strength
        03

        YIELD
        · Large scale production, strong R & D strength

        The 29 person R & D team, with 1% of the annual output value, has a complete sleeper whole process production line, and the production line of the flow unit method produced by our company has been used in many domestic sleeper production enterprises for many years, and is a set of technically mature sleeper production line equipment with the highest efficiency and the lowest failure rate, Our company uses this set of production equipment to establish its own sleeper production plant, and the sleeper products have obtained the production license of the State Administration of quality。

    24. JULI-Strict quality inspection, each sleeper can be traced
        04

        QUALITY
        · Strict quality inspection, each sleeper can be traced

        Select high-quality raw materials, steam demoulding one-time molding; each sleeper has to go through the mechanical property test, sleeper products have obtained the production license of the State Administration of quality; we are not only the manufacturer of production line equipment and mold, but also the manufacturer of sleeper products. We use our own equipment to produce sleepers, and at the same time, we produce other sleepers nationwide Mould provided by manufacturer。

    25. JULI-Periodic service and regular return visit
        05

        SERVICE
        · Periodic service and regular return visit

        The technical team can effectively solve all kinds of problems in the process of track use and provide all-round technical support; 7 * 24-hour service experience, mainly including periodic track update or overhaul, periodic track comprehensive maintenance, regular inspection and key repair. The maintenance and repair of railway line can be divided into three aspects: regular maintenance, medium repair and overhaul。

    26. JULI-Quality system certification, safe and assured
        06

        CARD
        · Quality system certification, safe and assured

        In 2003, it passed the ISO9001 international quality system certification of "Qufu Juli steel formwork and Steel Structure Co., Ltd."; in 2013, it cooperated with Beijing Jiaotong University to develop the first RPC concrete spherical hinge in China, and obtained 17 national patents; in September 2015, it passed the ISO9001 international quality system certification of "Qufu Juli Railway Rail Engineering Co., Ltd."。

    27. NEWS INFORMATION

      Your attention is our driving force

      QUFU JULI

      Sincerely welcome friends from all walks of life

      COMPANY PROFILE

      "Integrity based, customer first, quality for survival" service tenet
      dedicated to the new and old customers

      Qufu Juli Railway Track Engineering Co., Ltd.Founded in 2001, it is located at the south end of Chuangye Avenue, Taiwan Industrial Park, east of Qufu. Beijing Shanghai high speed railway in the East, Ridong Expressway in the south, Jingfu Expressway in the west, and the intersection of national highway 104 and 327 in the north. The plant covers an area of more than 200 mu, with a construction area of more than 30000 square meters and 350 sets of mechanical power equipment. The total value of fixed assets is more than 80 million yuan. There are 212 employees and 29 professional and technical personnel, including 4 senior technical titles, 12 intermediate technical titles and 13 junior technical titles. There are 48 intermediate professional and technical workers. At present, a five department and one office management system has been set up under the senior management of the chairman, general manager,……
      Qufu Juli Railway Track Engineering Co., Ltd.

      Qufu Juli Railway Track Engineering Co., Ltd.Founded in 2001, it is located at the south end of Chuangye Avenue, Taiwan Industrial Park, east of Qufu. Beijing Shanghai high speed railway in the East, Ridong Expressway in the south, Jingfu Expressway in the west, and the intersection of national highway 104 and 327 in the north. The plant covers an area of more than 200 mu, with a construction area of more than 30000 square meters and 350 sets of mechanical power equipment. The total value of fixed assets is more than 80 million yuan. There are 212 employees and 29 professional and technical personnel, including 4 senior technical titles, 12 intermediate technical titles and 13 junior technical titles. There are 48 intermediate professional and technical workers. At present, a five department and one office management system has been set up under the senior management of the chairman, general manager,……

      两男吮着她的花蒂尿

      <form id="vtntp"></form>

        <address id="vtntp"><nobr id="vtntp"><meter id="vtntp"></meter></nobr></address>

        <form id="vtntp"><listing id="vtntp"></listing></form>

          <sub id="vtntp"></sub>

          <form id="vtntp"></form>